GUIDE

What is Kanban: a complete guide from board to flow.

Kanban is a method for visualizing work, limiting what's in progress, and making tasks flow through to the end. Here you'll see its origin, the rules, the metrics, and ready-made boards for IT, marketing, HR, and support.

Kanban is a method for making work visible, limiting how many things are in progress at the same time, and getting each item to move all the way through without sitting idle along the way. The best-known symbol is the board with columns and cards, but the board is just the visible part. What makes the method work is the rules behind it.

This guide explains Kanban from scratch: where it came from, what the principles are, how to build a real board, how to use WIP limits, which numbers to track, and how the method differs from Scrum. The examples are from Brazilian companies in different fields, because Kanban works anywhere there's work with stages.

What is Kanban

The word comes from Japanese and means, broadly, card or signal. In current usage, "Kanban" refers to two levels. At the simple level, it's the visual board: columns represent the stages of the process and cards represent work items. At the full level, it's a management method with principles and practices that use this board to improve flow.

The difference matters. Plenty of teams set up a board with "To do, Doing, Done," hang 40 cards in "Doing," and conclude Kanban didn't work. What they built was a list with columns. Without a limit on work in progress, without clear rules for when a card advances, and without looking at how long tasks take, the board shows the mess but doesn't help fix it.

The core idea in three verbs

  • Visualize. All the work shows up on the board, including what nobody wanted to see, like the request that's been sitting around waiting for approval.
  • Limit. Each stage accepts a maximum number of items. To start something new, you have to finish or unblock something that's already there.
  • Flow. The goal stops being "keep everyone busy" and becomes "get items through the process with the shortest possible wait time."

Where Kanban comes from

The method was born in industry. At Toyota, engineer Taiichi Ohno developed, after World War II, the so-called Toyota Production System, which aims to reduce waste and produce only what's needed, when it's needed. The kanban card was that system's signal: when a workstation consumed parts, a card went back to the previous stage requesting replenishment. Production was pulled, not pushed.

This logic of "pull work when there's capacity" was brought to knowledge work in the 2000s. The name most associated with that adaptation is David J. Anderson, who applied the method to software development teams and described it in the 2010 book Kanban. Since then, the method has spread to fields that have nothing to do with programming: agencies, HR, legal, operations, healthcare, and customer service.

A useful observation: on the factory floor, the card controls physical production, and the stock of parts is visible. In knowledge work, the "stock" is invisible, because it's ideas, requests, and emails. The board exists precisely to give that stock a visible form.

Kanban principles and practices

Anderson's version has a foundation that's usually summarized as change principles and management practices.

Change principles

  1. Start with what you do now. You don't tear down the current process to install another. The board reflects the way work already happens.
  2. Agree to pursue incremental, evolutionary change. Small, frequent adjustments, instead of big overhauls nobody can stand.
  3. Respect current processes, roles, and job titles. Nobody has to change jobs to get started.
  4. Encourage leadership at every level. Whoever notices a bottleneck can propose the change.

The six practices

  1. Visualize the workflow. The board with the real stages of the process.
  2. Limit work in progress (WIP). The maximum number of items per stage.
  3. Manage flow. Look at where items stop and why.
  4. Make policies explicit. Write down the rules everyone follows.
  5. Implement feedback loops. Regular reviews of the board and the metrics.
  6. Improve collaboratively. The team decides together what to adjust.

If you read the practices carefully, you'll notice that only two of them, limiting WIP and managing flow, are really different from what most teams already do. That's where the gain shows up.

How to build a Kanban board

Columns: the real stages of your process

The most common mistake is copying the columns from a template. Start by asking: what stages does an item really go through, from request to delivery? Write each one down. The board's columns are those stages, in the order they happen.

The minimum is "To do, In progress, Done." What's usually worth doing is splitting "In progress" into the stages that matter for your field, like "In production," "In review," and "Waiting on client." Splitting shows where work waits, and waiting is what you need to see.

A trick to avoid excess: if a column always has zero or one card, it probably doesn't represent a real stage. If a column always has 15, it probably hides two or three different stages.

Cards: one work item each

Each card is one deliverable unit of work: an order, a task, a ticket, a job opening. A good card has a clear title, an assignee, a due date when there is one, and a place for a checklist, attachments, and comments. Prefer cards of similar size. If one card takes an hour and another takes a month, flow metrics lose their meaning, and it's worth breaking the big one into parts.

You can tell cards apart by type or class of service, using tags or colors: for example, "defect," "improvement," and "urgent." The point is that whoever looks at the board understands, in two seconds, what deserves attention first.

Swimlanes: the same board from another angle

Swimlanes are horizontal bands that divide the board by some criterion. The most common are by assignee, by priority, by client, or by type of work. The assignee lane answers "who's loaded up?"; the priority lane answers "is the urgent stuff moving?" Instead of creating separate boards for each question, you group the same board in different ways.

Explicit policies: the written rules

An explicit policy is a rule everyone knows because it's written next to the board. Instead of "we usually review before delivering," it becomes: "No card leaves Review without approval from another team member." Good policies usually answer five questions.

  • What has to be ready for the card to enter the column?
  • What has to be ready for the card to leave it?
  • What's the column's WIP limit?
  • Who can pull a new card?
  • What do you do with a blocked card and how long can it stay that way?

Writing the policy on each column, even a short one, ends a good share of the "is this done yet?" arguments.

WIP limit: the practice that changes the game

WIP stands for work in progress. The WIP limit is the maximum number of items each column accepts. When the column reaches its limit, nobody pulls a new item into it; the team first has to help finish what's there.

Why limiting helps

Starting a lot of things at once seems productive and, in practice, slows everything down. Every person who switches between five tasks spends time recovering context, and no task finishes quickly. When the limit prevents new tasks from starting, the team goes after what's stalled. The result is fewer things left half done, and each item moves through the process faster.

Numeric example

A Florianópolis agency, Maré Comunicação, has four people in content production: two writers and two designers. With no limit, on a typical Tuesday the board had 14 pieces in "In production" and 9 in "Internal review." No piece went out in under five days.

The team set the following limits:

ColumnWIP limitReasoning
Approved briefNo limitIt's the intake queue; it only serves for prioritizing.
In production4One piece per person.
Internal review2Only the coordinator reviews; any more than that becomes a queue.
Waiting on client6Depends on third parties, so the limit is looser.
PublishedNo limitExit column.

In the first week, the team got stuck at "Internal review" because the coordinator had two pieces and nobody could push a third. Instead of piling up, the writers started reviewing each other's text before sending it to the coordinator, which reduced rework. The limit exposed a bottleneck that had been hidden behind the volume.

How to choose the first limit

  • Start near the number of people working in the column, or slightly below.
  • If the limit is exceeded every day, it's too low or the process has a problem that needs attention.
  • If the column never fills up, the limit isn't limiting anything: lower it.
  • Review every two or three weeks, based on what the board showed.

A WIP limit isn't punishment. It's a signal: when the board "locks up," the method is working and showing where attention needs to go.

Flow metrics: lead time, cycle time, throughput, and cumulative flow

You track Kanban with a few numbers, all based on dates the board already records. Tasskee's flow view brings these indicators together, and it's also worth reading the post Kanban or Gantt, which compares the board with the schedule.

MetricWhat it measuresWhat it's for
Lead timeTotal time from request to delivery.It's what the client feels: how long they wait.
Cycle timeTime from when work starts until it's finished.Shows the team's speed once it picks up the item.
ThroughputHow many items were completed per period (per week, for example).A basis for predicting how much the team delivers.
Cumulative flowChart with the number of items in each stage over time.Shows buildup and bottlenecks before they turn into delays.

Lead time and cycle time, with an example

At Clínica Vida Plena, in Curitiba, the administrative department receives reimbursement requests. A request arrives on Monday, waits three days for someone to pick it up, is reviewed on Thursday, and is completed on Friday. The lead time is five days (Monday to Friday). The cycle time is two days (Thursday to Friday). The difference, three days, is queue. To shorten the turnaround, asking the analyst to work faster does no good: the bottleneck is at intake.

Throughput and forecasting

If the team completed 8, 11, 9, and 12 items in the last four weeks, the average is 10 items per week. With 40 items in the queue, an honest estimate is four weeks, and a range (three to five weeks) is more reliable than an exact date. That lets you answer "when will it be done?" based on history.

How to read cumulative flow

In the cumulative flow chart, each stage is a colored band. When the bands stay parallel, work is flowing. When the band of a middle stage gets fat, items are piling up there, and that's the bottleneck. If the "Done" band stays flat for many days, nothing is being delivered. It's the best chart for seeing the problem before it turns into a delay.

Kanban vs. Scrum

Both approaches are agile, but they start from different logic. See the Scrum guide for the other side of the comparison.

AspectKanbanScrum
RhythmContinuous: work enters when there's capacity.In fixed-length cycles (sprints).
RolesNone required.Product Owner, Scrum Master, and developers.
MeetingsNone required; the team defines its own.Planning, daily, review, and retrospective.
Main controlWIP limit per column.Scope agreed for the sprint.
Change midwayAllowed, if it fits within the limit.Avoided during the sprint.
Typical metricLead time, cycle time, throughput.Velocity and burndown.
Best fitWork with unpredictable demand: support, maintenance, operations.Projects with incremental deliveries and negotiable scope.

You don't have to pick a side. Teams that run sprints often use a Kanban board to show the sprint's progress, and support teams that work in continuous flow set aside a sprint or a lane for internal projects. The board is the common ground.

Board examples for four fields

IT and development

At Bitwave, a fictional software house in Joinville with six developers, the board has these columns: Backlog, Ready to develop, In development (limit 5), In code review (limit 3), In testing (limit 2), and In production. The policy for "In code review" is that no card stays there more than one business day; past that, it becomes the first topic of the meeting. The limit of 3 in review made the team stop opening new tasks when the reviewer was overloaded.

Marketing

At Rota Digital, an agency in Belo Horizonte, the columns are: Brief, Approved topic, Creation (limit 4), Internal approval (limit 2), Client approval, Scheduled, and Published. The swimlanes split by client. When a client is slow to respond, the cards sit in "Client approval," and the lane makes it clear whose turn it is. That changes the conversation with the client: instead of "we're behind," the agency shows that six pieces are waiting on their feedback.

HR and recruiting

At distributor Sul Atacado, in Caxias do Sul, each job opening is a card, and the columns are the hiring process stages: Open position, Résumé screening, HR interview (limit 6), Manager interview (limit 4), Offer, and Hired. The limit on manager interviews keeps HR from sending more candidates than the manager can handle, which used to leave good candidates waiting a week. The lead time of an opening, from posting to hire, becomes the department's main metric.

Support and customer service

At Conecta Provedor, in the interior of São Paulo, technical support organizes tickets into: New, In diagnosis (limit 5), Waiting on customer, Technician visit scheduled, Resolved. The "Waiting on customer" policy says that after 48 hours with no response, the ticket is closed with a notice. The board lets the team see what's been stuck the longest. For anyone who needs a queue with deadlines and SLAs, Tasskee has a separate module, tickets; the SLA guide explains the concept.

In all four cases, the design is the same: real stages, a limit where there's a risk of queueing, a written rule, and a time metric.

Common mistakes when adopting Kanban

  1. Copying columns from a template. The board needs to reflect your process, not a generic one.
  2. Not setting a WIP limit. Without a limit, the board becomes a wall of pending items that grows nonstop.
  3. A limit that's too high so it won't "bother" anyone. If the limit is never reached, it doesn't limit.
  4. Giant cards and tiny cards on the same board. It becomes impossible to measure flow.
  5. An "In progress" column that hides waiting. If the item is waiting on someone, it needs a column or a blocked marker.
  6. An outdated board. If the real status is somewhere else, nobody looks at the board. The rule is: if it's not on the board, it doesn't exist.
  7. Cutting the line all the time. If everything is urgent, nothing is. Define an "urgent" class with its own limit (for example, at most one card at a time).
  8. Ignoring the metrics. The board shows the present; lead time and cumulative flow show the trend.
  9. Using Kanban to watch people. The focus is the flow of work, not individual productivity. When the board becomes a tool for chasing people, they start hiding problems.
  10. Never reviewing. The process changes; limits and columns need to keep up.

How to start in one week

  1. Day 1. Get the team together and list, on a sheet of paper, the stages the work goes through.
  2. Day 2. Build the board, put all in-progress items on it, and write what "done" means for each column.
  3. Day 3. Set the first WIP limits and warn the team that they're going to be annoying on purpose.
  4. Days 4 and 5. Use the board. Note where it got stuck and why.
  5. End of the week. Meet for 20 minutes to adjust limits and rules. Repeat every week at first, then every two weeks.

A short meeting in front of the board, about 10 to 15 minutes, is enough for the routine: walk through the columns from right to left, from what's closest to finished to what just started. That way, the team prioritizes finishing before starting.

How to do it in Tasskee

Tasskee's Kanban board starts from the idea that the columns are the ones from your process. You create, rename, and reorder each project's statuses, and the task changes stage with a drag. Here's what to use to apply this guide.

  • Columns for your workflow. Each project can have the statuses your field really uses, like "In review" or "Waiting on client."
  • Board grouped by any field. Split into swimlanes by assignee, priority, sprint, type, or schedule, and see who's overloaded or whether the urgent stuff is moving. Grouping by another field is on the Pro plan.
  • Customizable card. In the Card menu, you turn on and off the information shown (project, code, due date, progress, priority, points, and assignees) and choose normal or compact density. The preference is yours and doesn't change your teammates' board.
  • Saved views. Save the filter and grouping and come back to them with one click, without rebuilding the board every Monday (Pro plan).
  • The task tells the story. Due date, tags, checklist, attachments, subtasks, and comments live on the card.
  • Other views of the same task. From the board you move to the calendar, list, or schedule, without duplicating anything.
  • Flow metrics. The flow view and the reports bring lead time, cycle time, and cumulative flow so you can review limits with data.

Board and list are on all plans, including Free. If your team works in two-week cycles, the backlog and sprint template shows how to combine the board with cycle-based planning, and the sprints feature adds backlog, burndown, and velocity.

Try the Kanban board with your process

Create your field's columns, set the limits, and track the flow. Try it free for 15 days with Pro unlocked, no credit card.

See Tasskee's Kanban board
Frequently asked questions

Frequently asked questions

What is Kanban, in one sentence?
It's a work management method that uses a board with columns to show progress, limits how many tasks are in progress at the same time, and measures how long each one takes to finish.
Are Kanban and a Kanban board the same thing?
No. The board is just the visible part. The method also includes the work-in-progress (WIP) limit, explicit rules for each column, and flow measurement. A board with no limit and no rules is just a list with columns.
What's the ideal WIP limit?
There's no universal number. A common starting point is the number of people in the column, or slightly fewer. Start with a limit that pinches a little, watch for two or three weeks to see where work piles up, and adjust.
Does Kanban work for teams outside IT?
It does. Marketing, HR, finance, legal, support, and building maintenance use the method because it doesn't require cycles or roles: all you need is a workflow with stages.
What's the difference between Kanban and Scrum?
Scrum works in fixed-length cycles (sprints) with defined roles and meetings. Kanban is continuous: work enters when there's capacity, and the control is the WIP limit. Many teams combine the two.
Do I need to pay to use Kanban in Tasskee?
No. Board and list are on every plan, including Free. Grouping the board by another field, saving views, and bulk actions are on the Pro plan.

Build your Kanban board in minutes

Columns for your process, customizable cards, and saved views. Try it free, no credit card.

15 days with everything unlocked No credit card Support in Portuguese
Contact us